Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Manufacturing | Automotive | Spare Parts ABC Criticality Ranking
Our client now has the right type and amount of spare parts available in the…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Client Reference | OEM | Baking Equipment | After Sales Service | Debtor Management | On Key Syspro Interface
Part of our client’s after-sales offering to the market is to have qualified technicians not…
Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow
Shell is a national supplier of petroleum products and have a proud record of presenting…
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Case Study | OEM | MacAdams | AMIP
Without Pragma’s involvement, we would only have been able to come up with 10% of…
