Offline and online condition assessments were conducted during the repair process to validate that the workmanship was successfully implemented to the correct standards.
Client Reference | Water Utility | Fixes on Critical Switchgear Components
More content
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Reference Story | Local Government | Municipality CoCT Waste Water
Our client supplies up to 880 000 m3of water to customers daily. This is a…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Client Reference | Local Government | District Municipality | Water | AMIP
Our client is a typical district municipality (DM) in a rural area of South Africa.…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…