In this case study, we illustrate how our Asset Health Management for Generators solution assists a South African municipality in taking control and proactively managing more than 200 generators ranging from 30kVa to 2000kVA. These generators are spread over a vast geographical area and are utilised by plants, pump stations and administration buildings.
Due to South Africa’s primary power supplier running an increased load shedding schedule, continuous energy supply to the operational departments are under threat. The need for generators increase dramatically, and the subsequent equipment availability is critical to start up and run at full capacity within seconds.
More content
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Client Reference | Mining | Coal | Customisation of Asset Tactics Navigation
Our client has a coal open cast mine, with one DMS plant for the beneficiation…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Proof of Concept | Facilities Management | Smart Building project
We challenged our R&D and FM teams to come up with an intelligent FM solution…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Client Reference | Mining | Coal | Customisation of Asset Tactics
The outputs of the customisation process included a more accurate budget on renewals or the…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…