It was a big help to get all the maintenance recommendations from the different equipment manufacturers converted perfectly to the standard and implement them in On Key. All the spares have also been made available in the global system and from there in the different market companies. It was a job very well done I would continue this way each time.
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
More content
Client Reference | Manufacturing Bottling | Global Beverage Producer: Using Lifecycle Costing for Financial Decision-making
Our client is a global producer of beverages. They package various products on various lines…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Client Reference | Facilities | Commercial Property | Pragma Service Request App
On Key Action provided a service request app that did away with system complexities and…
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Client Reference | Oil and Gas Petrochemical Plant | Equipment Maintenance Strategies
Pragma facilitated the successful development of equipment maintenance strategies and tactics, helped convert them into…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Mining | Coal | Customisation of Asset Tactics Navigation
Our client has a coal open cast mine, with one DMS plant for the beneficiation…