Our client is a leading automotive manufacturer in South Africa. The client embarked on a journey to implement an asset management system based on the Pragma Way. One part of that system is Focused Improvement and structured problem-solving
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
More content
Case Study | Oil and Gas | Fuel Retail Digital Transformation
The maintenance management of the Shell fuel retail network is managed via an end-to-end digitally…
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Mining and Minerals | Coal | Exxaro | Operations Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Case Study | Manufacturing | FoodBev | Libstar | Asset Care Academy
The intent was to create a common understanding of maintenance management among all plant engineers…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Reference story | Fast foods | Increase statutory SLA’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Client Reference | Local Government | Municipality | Water | Asset Care Plans at Pump Stations
Engineering is the maintenance division of The Water Department, tasked to ensure that the facilities…
