Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to medium enterprise (SME). Pragma immediately identified the opportunity to assist Volt Petroleum through our ESD process.
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
More content
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…
Case Study | Manufacturing | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Reference story | Fast foods | Increase statutory SLA’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Client Reference | Local Government | District Municipality | Water | AMIP
Our client is a typical district municipality (DM) in a rural area of South Africa.…
Client Reference | Manufacturing Bottling | Global Beverage Producer: Using Lifecycle Costing for Financial Decision-making
Our client is a global producer of beverages. They package various products on various lines…
Case Study | Oil and Gas Fuels Retail | Lowering Carbon Emissions
As part of Shell securing its position as the leading global mobility retailer, they have…
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
On Key is a cost saver because it allows us to become completely paperless and…
