MMC noticed that their personnel use their mobile phones extensively to access their daily reports. With most of their other reports embedded into the body of the email, the reports sent as attachments were less efficient for mobile usage as additional steps were required to view the reports. They requested Pragma to embed the two reports into the email body in their current format.
Case Study | Mining | Manganese | Embedded Email Reports
More content
Automotive | Improved uptime
With the aid of On Key and the Focused Improvement business process, it assisted us…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Client Reference | Manufacturing Automative | FI on Light Curtains
Analysing data on production stoppages with the assistance of a highly motivated cross functional team,…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Case Study | Oil and Gas | Retail | Sasol | Focused Improvement Dashboard
Pragma developed a dashboard to track improvement projects and highlight the combined costs of several…
Proof of Concept | Facilities Management | Smart Building project
We challenged our R&D and FM teams to come up with an intelligent FM solution…
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
Our client has better control over breakdowns and appropriate escalation processes is in place in…
