The primary crusher blocked on oversize material and suffered a breakdown that delayed production for over 24hrs. Engineers reviewed and intensified the maintenance strategy for the crusher based the crushing rate and workload.
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
More content
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers.…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
Client Reference | Mining and Minerals | Processing | AMIP and Strategy Development for Plants across the Globe
The client s a globally diversified mining and metals company with headquarters in Australia with…
Client Reference | Mining and Minerals | Platinum | Reliability Block Diagrams
The client has the opportunity to test various scenarios concerning maintenance interventions, allowing them to…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…