This project forms an integral part of the bigger asset management process by highlighting specific focus areas for immediate improvement.
Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy
More content
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Case Study | Facilities | Life Healthcare | On Key
On Key has been implemented at more than 50 Life Healthcare hospitals across South Africa…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Client Reference | Distributed Facilities | Postal Services | AMIP Assessment
The client is a premier provider of postal and parcel services in the Netherlands. They…
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
