Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
More content
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Case Study | Productie Voedingsindustrie | C&D Foods | On-Key-implementatie
Pragma ondersteunt het onderhoudsprogramma On-Key van C&D en stelt het management in staat beter inzicht…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…