Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
More content
Reference story | Supermarket / Retail Sector Contractor Management
Our client is one of the largest supermarket retailers in Africa, operating from more than…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
OEM | Tetra Pak | On Key
Pragma, with its expertise and technology in asset and maintenance management, is a key strategic…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…
Case Study | Oil and Gas Retail | Shell | Work Manager Application
The Work Manager app has significantly increased data quality, and velocity as data is entered…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…