With the aid of On Key and the Focused Improvement business process, it assisted us in decreasing the downtime at the headliners section.
Automotive | Improved uptime
More content
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Client Reference | Distributed Facilities | Retail | SLA driven performance
Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Client Reference | Oil and Gas Petrochemical Plant | Equipment Maintenance Strategies
Pragma facilitated the successful development of equipment maintenance strategies and tactics, helped convert them into…
Client Reference | Mining and Minerals Nickel | Reliability Engineering and Training FI
A multi-faceted approach involving facilitated, on-site training courses plus an on-site reliability engineering service, supplemented…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
