The primary crusher blocked on oversize material and suffered a breakdown that delayed production for over 24hrs. Engineers reviewed and intensified the maintenance strategy for the crusher based the crushing rate and workload.
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
More content
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV | AMIP | ACC
The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network,…
Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes
This is how we reduced our client’s printing paper usage by 25% and reduced their…
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
Complex interfaces between systems were removed that eased the management of large numbers of spare…
Case Study | Oil and Gas Fuels Retail | Lowering Carbon Emissions
As part of Shell securing its position as the leading global mobility retailer, they have…
Client Reference | Mining and Minerals | Quarries | Maintenance Planning and Scheduling Blended Training
Contact sessions with the facilitator, an experienced Pragma consultant, allowed teams to regroup, share experiences…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Client Reference | Local Government | Municipality | Water | Asset Care Plans at Pump Stations
Engineering is the maintenance division of The Water Department, tasked to ensure that the facilities…
Client Reference | Manufacturing | Real-time condition based monitoring using IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers.…
