The reticulation network at a local municipality has more than 600 pump stations across the region. Key challenges included frequent high failures of equipment with high resulting cost and consequence of critical equipment failure can have a significant negative impact on the public and environment. A criticality analysis was conducted on all pump stations within the reticulation network, and maintenance work is prioritised.
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
More content
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
Our client is a respected open cast coal mining and processing plant situated in the…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Facilities Retail | Maintenance Budget Management
Our client managed their operational budgets reactively using spreadsheets. It created a lot of manual…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…
Case Study | Mining and Minerals | Petra Diamonds | Centralising Asset Tree using a Placeholder Import in On Key
Petra Diamonds is a leading independent diamond producer with one of the worlds largest diamonds…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…