Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to medium enterprise (SME). Pragma immediately identified the opportunity to assist Volt Petroleum through our ESD process.
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
More content
Case Study | Mining and Minerals | Coal | Exxaro | Operations Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
Client Reference | Local Government | Municipality | Fleet Management Service
Our client is a metropolitan municipality in Southern Africa with a Fleet Management and Maintenance…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Reference story | Municipality | Asset Care Plans on SAP® PM
ACP’s are being identified and implemented in accordance to the asset management strategy.
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
