This is how we reduced our client’s printing paper usage by 25% and reduced their monthly recycling costs by 308% while working with them to develop an FM strategy.
Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes
More content
Client Reference | Mining | Providing a structured, role-based approach to skills development
Our client’s requirement for support with the training and development of their asset management resources…
Case Study | Oil and Gas | Fuel Retail Digital Transformation
The maintenance management of the Shell fuel retail network is managed via an end-to-end digitally…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
Case Study | Retail | Massmart | Making informed decisions, increasing efficiency and saving costs
Massmart is a South African based globally competitive regional management group, invested in a portfolio…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Reference story | Automotive | Criticality Analysis
Our client now has better insight into the criticality of their equipment and technologies, to…
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Client Reference | Manufacturing | Glass | Improvement of Asset Care Plan
Our client is a leading manufacturer and supplier of float glass, laminated glass and mirrors…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
