The number of processed proactive work orders increased by 103% YTD benchmarked to the previous financial year. The fleet schedule compliance improved by 17%from 82% -99%. Automated maintenance plans were configured for 211 vehicles. A planning section was established to manage Work Planning and Control activities.
Case Study | Improving Proactive Maintenance in Local Government
More content
Client Reference | Mining and Minerals | Quarries | Maintenance Planning and Scheduling Blended Training
Contact sessions with the facilitator, an experienced Pragma consultant, allowed teams to regroup, share experiences…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Reference story | Automotive | Criticality Analysis
Our client now has better insight into the criticality of their equipment and technologies, to…
Client Reference | Distributed Facilities | Retail | SLA driven performance
Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…