Focused interventions do not necessarily always have to lead to complex solutions where redesign or process changes are required. Maintaining the operational environment and the asset maintenance requirements and best practices are the ‘low-hanging fruits’ that can easily be rectified resulting in the designed performance of the asset.
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
More content
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Client Reference | Local Government | Municipality | Fleet Management Service
Our client is a metropolitan municipality in Southern Africa with a Fleet Management and Maintenance…
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Reference story | Fast foods | Increase statutory SLA’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Reference story | Municipal | AM Maturity Assessment
Shift towards optimal mix of reactive to proactive planned maintenance.
