This project forms an integral part of the bigger asset management process by highlighting specific focus areas for immediate improvement.
Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy
More content
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
Complex interfaces between systems were removed that eased the management of large numbers of spare…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
Pragma’s intervention has led to an increase in the number of units completed per day…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Case Study | Oil and Gas Retail | Shell | Critical Inspection Animated Training
The CEI clarification animations have become a Practice Worth Replicating in other markets and were…
Municipal | Integrating CMMS and municipal systems
On Key has assisted us to manage our daily operations effectively and also to enhance…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Client Reference | Facilities Retail | Maintenance Budget Management
Our client managed their operational budgets reactively using spreadsheets. It created a lot of manual…
Case Study | Oil and Gas | Retail | Sasol | Focused Improvement Dashboard
Pragma developed a dashboard to track improvement projects and highlight the combined costs of several…
