Without Pragma’s involvement, we would only have been able to come up with 10% of the answer in the available time.
Case Study | OEM | MacAdams | AMIP
More content
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Client Reference | OEM | Baking Equipment | After Sales Service | Debtor Management | On Key Syspro Interface
Part of our client’s after-sales offering to the market is to have qualified technicians not…
Case Study | Facilities | Life Healthcare | On Key
On Key has been implemented at more than 50 Life Healthcare hospitals across South Africa…
Client Reference | Manufacturing Bottling | Global Beverage Producer: Using Lifecycle Costing for Financial Decision-making
Our client is a global producer of beverages. They package various products on various lines…
Reference story | Automotive | Criticality Analysis
Our client now has better insight into the criticality of their equipment and technologies, to…
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Client Reference | Distributed Facilities | Postal Services | AMIP Assessment
The client is a premier provider of postal and parcel services in the Netherlands. They…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
