Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders, and proper Work Order planning sessions were held with the parties concerned.
Mining | Planning and Scheduling
More content
Case Study | Mining and Minerals | Coal | Exxaro | Maintenance Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
Our client is a respected open cast coal mining and processing plant situated in the…
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
Our client has better control over breakdowns and appropriate escalation processes is in place in…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Case Study | Improving Proactive Maintenance in Local Government
The number of processed proactive work orders increased by 103% YTD benchmarked to the previous…
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Case Study | Oil and Gas | Fuel Retail Digital Transformation
The maintenance management of the Shell fuel retail network is managed via an end-to-end digitally…
