Since the implementation of the initiative, the statutory SLA for work orders completed increased from an average of 66% per month to an average of 94% per month.
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
More content
Client Reference | Manufacturing | Glass | Improvement of Asset Care Plan
Our client is a leading manufacturer and supplier of float glass, laminated glass and mirrors…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Client Reference | Manufacturing Automotive | Rotable Spares
The new rotable process is well integrated within all shops at our client. An increase…
Coal | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Case Study | Mining and Minerals | Coal | Exxaro | Maintenance Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Oil and Gas Retail | Shell | Work Manager Application
The Work Manager app has significantly increased data quality, and velocity as data is entered…
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
Complex interfaces between systems were removed that eased the management of large numbers of spare…
Case Study | Manufacturing | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Client Reference | Mining and Minerals Nickel | Reliability Engineering and Training FI
A multi-faceted approach involving facilitated, on-site training courses plus an on-site reliability engineering service, supplemented…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
