The biggest benefit of this focused improvement project is the reduction in claims placed by clients due to incorrect spare parts being ordered and work executed.
Reference story | Packaging | Maintenance plans
More content
Client Reference | Manufacturing | Automotive | Focused Improvement
The process we followed was excellent. It helped us identify problems and potential root causes…
Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow
Shell is a national supplier of petroleum products and have a proud record of presenting…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Municipality | Sub-station maintenance
The ACC provided a platform for the staff at ESS to be able to easily…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
Our client is a respected open cast coal mining and processing plant situated in the…
