Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Client Reference | Mining | Coal | Customisation of Asset Tactics Navigation
Our client has a coal open cast mine, with one DMS plant for the beneficiation…
Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV | AMIP | ACC
The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network,…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Case Study | Oil and Gas | Fuel Retail Digital Transformation
The maintenance management of the Shell fuel retail network is managed via an end-to-end digitally…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Case Study | Retail | Massmart | Making informed decisions, increasing efficiency and saving costs
Massmart is a South African based globally competitive regional management group, invested in a portfolio…
Reference Story | Local Government | Municipality CoCT Waste Water
Our client supplies up to 880 000 m3of water to customers daily. This is a…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
