Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel pumps from 2012 to 2016.
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
More content
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…
Proof of Concept | Facilities Management | Smart Building project
We challenged our R&D and FM teams to come up with an intelligent FM solution…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Case Study | Oil and Gas Retail | Shell | Critical Inspection Animated Training
The CEI clarification animations have become a Practice Worth Replicating in other markets and were…
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Client Reference | Distributed Facilities Retail | Value Add and Cost Savings
We would like to see savings on our maintenance bill as well as fewer product…
Case Study | OEM | MacAdams | AMIP
Without Pragma’s involvement, we would only have been able to come up with 10% of…
