Our client now has the right type and amount of spare parts available in the engineering store to use when required.
Client Reference | Manufacturing | Automotive | Spare Parts ABC Criticality Ranking
More content
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
Case Study | Oil and Gas | Retail | Sasol | Focused Improvement Dashboard
Pragma developed a dashboard to track improvement projects and highlight the combined costs of several…
OEM | Tetra Pak | On Key
Pragma, with its expertise and technology in asset and maintenance management, is a key strategic…
Municipality | Training
The training helped me greatly with the implementation of the asset management improvement project in…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Mining and Minerals | Quarries | Maintenance Planning and Scheduling Blended Training
Contact sessions with the facilitator, an experienced Pragma consultant, allowed teams to regroup, share experiences…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…