Our client has better control over breakdowns and appropriate escalation processes is in place in the Rear Axle Area. In year one, there was an average of between 60 and 70 breakdowns in a 4-week period. From Calendar Week 20 –23 in year two, there were only 39 breakdowns in the Rear Axle Area and a downtime of 36 minutes. (Decrease of 35-45% in the number of breakdowns).
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
More content
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Municipality | Training
The training helped me greatly with the implementation of the asset management improvement project in…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Manufacturing | Real-time condition based monitoring using IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Client Reference | Distributed Facilities Retail | Value Add and Cost Savings
We would like to see savings on our maintenance bill as well as fewer product…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Case Study | Improving Proactive Maintenance in Local Government
The number of processed proactive work orders increased by 103% YTD benchmarked to the previous…