The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were instantly measurable to test the value-add of the maintenance plan.
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
More content
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Client Reference | Distributed Facilities | Postal Services | AMIP Assessment
The client is a premier provider of postal and parcel services in the Netherlands. They…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Case Study | Local Government | City of Cape Town | Electrical Support Services | Substation Maintenance
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Case Study | Oil and Gas Retail | Shell | Supplier Savings
The renegotiation of prices is an important part of Pragma’s supply chain responsibilities on the…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
On Key is a cost saver because it allows us to become completely paperless and…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…