In this case study, we illustrate how our Asset Health Management for Generators solution assists a South African municipality in taking control and proactively managing more than 200 generators ranging from 30kVa to 2000kVA. These generators are spread over a vast geographical area and are utilised by plants, pump stations and administration buildings.
Due to South Africa’s primary power supplier running an increased load shedding schedule, continuous energy supply to the operational departments are under threat. The need for generators increase dramatically, and the subsequent equipment availability is critical to start up and run at full capacity within seconds.
More content
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Municipality | Sub-station maintenance
The ACC provided a platform for the staff at ESS to be able to easily…
Client Reference | Mining and Minerals | Asset Management Professional Development Programme
This is how we assisted one of our mining clients to develop their Asset Management…
Chicken processing equipment | After sales
For Meyn, it is important to have a trustworthy single view on our Installed Base…